Monday, April 26, 2010

Day 22; Rain & Road Construction.....

...really dont go very well together. It was a tough weekend with all of the rain, and specifically for those residents in the 300 Block of Kensington. The rain played havoc with their weekend plans and ability to enjoy the freedom of movement.

We talked with the Contractor today about some changes to the maintenance of the roadways to allow local traffic better and more assured access, especially during rain events. That said, the reality is that we may not be able to control all of the extraeneous environmental factors like the weather.

In work today, crews continued making the residential service connections. They are now in the 300 block of Kensington. Road crews spent a portion of the morning/day working to get roads passable again. The objective is to have Fisk Place and the 400 Block of Kensington, rocked and road prepped ready by the end of the week. The additional crew comes into town tomorrow so we will continued progress on water main in the 200 block of Kensington.

No comments:

Post a Comment