Tuesday, April 6, 2010

Day 2; 4/6/2010

Not alot of work today due to the heavy rain overnight and into the morning. A bit more asphalt was taken off of Kensington. They will continue that process for the balance of the week in the lower bluff. If you live on Woodland Circle, Roxbury, or Cambridge, be patient, they will get there soon!!

With rain expected yet again tonight, we are not expecting any pipe installation to take place this week.

I have heard several positive comments from neighbors who have encountered some brief access issues but those were quickly remedied by construction crews. If you experience something different, please let me know.

As an aside, a neighbor in the Kensington Drive area today observed some young children walking with their parents and the kids were carrying marking flags which had apparently been pulled from their designated locations. Please be sure to maintain the integrity of any marking flags, wood/lattice or similar posts, etc. Those markings have specific meanings and may be a safety or security indicator for construction and engineering crews.

No comments:

Post a Comment